I was asked by me client if I was able to tidy up there entrance hallway including
Wallpapering 2 walls after removing radiator
Running beading along skirting board line to hide gaps in flooring
Caulking all joins prior to painting
Repainting skirting and door frames
Installing new coat hooks and shelving
Fitting a new brushed steel light switch in place of the old plastic one.
Comments